| Client | : | Subsea7 |
| Location | : | Türkiye |
| Tonnage | : | 765t |
SCOPE
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• Load-out
Sakarya Gas Field Development Project Phase 1 Installation Aids Fabrication covers the shop drawing preparation, fabrication, coating, QC documentation and loadout of 106 structures with the weight of 765 tons.