| Client | : | Onesubsea |
| Location | : | Türkiye |
| Tonnage | : | 460t |
SCOPE
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out
Sakarya Gas Field Development Project Phase II Manifold & Suction Pile Fabrication covers the shop drawing preparation, fabrication, coating, QC documentation and FAT activities of 8-Slot Production Manifold (228 tons) and Suction Pile (232 tons) with a diameter of 8.6 meters. The delivery term is FOB.