| Client | : | Subsea7 |
| Location | : | Türkiye |
| Tonnage | : | 100t |
SCOPE
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out
Sakarya Gas Field Development Project Phase 2 Sliding Frame Fabrication covers the shop drawing preparation, fabrication, coating, QC documentation and FAT activities of 16” Export PLET and 8” MEG PLET with the weight of 100 tons. The delivery term is FOB.