Projects

Subsea Structures

SAKARYA GAS FIELD DEVELOPMENT PROJECT PHASE - II

Installation Aids

20250627-0193
Client:Subsea7
Location:Türkiye
Tonnage:430t

SCOPE

• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out

Sakarya Gas Field Development Project Phase 2 Installation Aids Fabrication covers shop drawing preparation, fabrication, coating, QC documentation and loadout of 75 structures with the weight of 430 tons. Also scope covers FAT activities for Wet Parking Frames, Turning Bollards and Anode Sleds.