| Client | : | Subsea7 |
| Location | : | Türkiye |
| Tonnage | : | 430t |
SCOPE
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out
Sakarya Gas Field Development Project Phase 2 Installation Aids Fabrication covers shop drawing preparation, fabrication, coating, QC documentation and loadout of 75 structures with the weight of 430 tons. Also scope covers FAT activities for Wet Parking Frames, Turning Bollards and Anode Sleds.