SAKARYA GAS FIELD DEVELOPMENT PROJECT PHASE - I

Rigid Spool Fabrication

Subsea1
Client:Subsea7
Location:Türkiye
Tonnage:146t

SCOPE

• Shop drawing preparation
• Fabrication
• HSS Coating
• QC documentation
• FAT activities
• Load-out

Sakarya Gas Field Development Project Phase 1 Rigid Spool Fabrication covers the shop drawing preparation, fabrication, HSS Coating, QC documentation and FAT activities of 6 Rigid Spools, specifically 3 units of 10-inch and 3 units of 16-inch spools. The work encompasses both Pre-Metrology and Post-Metrology Activities with a total of 1,248 Dia Carbon Steel and CRA joints. The delivery term is FOB.