Projects

Subsea Structures

SAKARYA GAS FIELD DEVELOPMENT PROJECT PHASE - II

Manifold & Suction Pile

20250917-0029
Client:Onesubsea
Location:Türkiye
Tonnage:460t

SCOPE

• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out

Sakarya Gas Field Development Project Phase II Manifold & Suction Pile Fabrication covers the shop drawing preparation, fabrication, coating, QC documentation and FAT activities of 8-Slot Production Manifold (228 tons) and Suction Pile (232 tons) with a diameter of 8.6 meters. The delivery term is FOB.