| Client | : | Subsea7 |
| Location | : | Türkiye |
| Tonnage | : | 314t |
SCOPE
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• FAT activities
• Load-out
Sakarya Gas Field Development Project Phase 2 RBA Piles Fabrication covers shop drawing preparation, fabrication, coating, QC documentation and FAT activities of 16” Export Riser Pile and 8” Initiation Pile with the weight of 314 tons. The delivery term is FOB.