| Client | : | Global Offshore Engineering |
| Location | : | Türkiye |
| Tonnage | : | 2.263t |
SCOPE
• Procurement
• Shop drawing preparation
• Fabrication
• Coating
• QC documentation
• SIT activities
• Load-out
Sakarya Gas Field Development Project Phase 2 Suction Anchors Fabrication covers procurement, shop drawing preparation, fabrication, coating, QC documentation, site integration activities and loadout of 20 suction anchors with the weight of 2.263 tons.